Skip to content
Menu
James Rathbun
  • Projects
    • 24 Pound Naval Gun
    • Homelab Projects
      • AllStarLink Radio Node
    • Lewis Horizontal Mill
    • Photography
      • German Equatorial Mount
    • South Bend 9A – “The General”
      • Headstock Spider
  • Social Media
  • About James L Rathbun
    • Professional Biography
    • Contact
  • Site map
James Rathbun
Drilling a 3.8 hole down the center of the axle to loose some weight.

Equatorial Mount -Turning Axles

Posted on February 20, 2020June 27, 2022

Since deciding I wanted to start an Equatorial Mount for my budding astrophotography career, I have been going searching for parts. As luck would have it, my brother was rebuilding his patio and gave me a mount for his old satellite dish antennae. The piece is not perfect, but it will serve nicely as a screw mount adjustable wedge to align the mount with the polar access. The base of the unit was not useful for my purposes and it seems quite study.

The next pieces I need to purchase where four pillow blocks which I found from our good friends at Amazon.com for about $24. The pillow blocks I ordered where for a 1 inch axle and when they arrive, I measured them at 0.950 inches. The pillow blocks seem to be well built and once I had them in hand, I began to question the overall weight on this project.

A previously used satellite mount and 4 pillow blocks start the foundation of my to be built German Equatorial Mount
A previously used satellite mount and 4 pillow blocks start the foundation of my to be built German Equatorial Mount

For the axle shafts themselves, I picked them up for $17 from a local company here in Vegas called Curtis Steel. I purchase two feet of cold rolled steel at 1.25 inches in diameter. This should give me 0.30 inches of material to find the center and cut down the axles.

Turning the Axles

Fortunately, my South Bend was up to the task and the new tool holder cut down on the chatter. I was able to turn 0.025 inches off the radius with no issues. Turning this amount off introduced quite a bit of heat into the project. So, after two passes I swapped the project steel out and let it cook while I tuned the second bar down. I was overall very happy with the performance and once down to 1.140 inches, I drop to cuts down to 0.005 so that I did not overshoot the inner diameter of the pillow block. I was intent on making these axles complete fill the pillow bock bearing so that they are true and will find there centers.

Turning a 1.25" steel bar down to size to serve as an axle
Turning a 1.25″ steel bar down to size to serve as an axle

I was being very cautious of not over shooting my destination diameter of 0.950 inches in order to keep a very tight fit. Once I turned the axles down to 1.000 I opted to take the last little bit of material down using a file and then 100 grit sand paper. After a few minutes of work with each, I would stop progress and measure and attempt to fit the bearings.

Looking at the end of the axle in the pillow block
Looking at the end of the axle in the pillow block

Once I was complete with the two axles I did a quick tested and confirmed that at this pint, the weight of my DYI Equatorial Mount is going to be an issue. Up until this point in time, I was planning on using two equal length axles. I have adjusted my plans to shorten the bar on the declination axis. Additionally, I am thinking that I may mount the pillow bearings on plate aluminum rather than steel.

Drilling a 3.8 hole down the center of the axle to loose some weight.
Drilling a 3.8 hole down the center of the axle to loose some weight.

There is also little doubt in my mind that boring on whole down the axis of each bearing should remove quite a bit of weight and still maintain some strength within the system. Previously, I was planning on drilling out the right ascension axle to assist with polar alignment. I am now thinking about going 0.5 inches over the originally planned for 3/8 of on inch and doing this with both axis.

A near finished axle being tested in the pillow blocks
A near finished axle being tested in the pillow blocks

I do realize that this DYI Equatorial Mount is probably overkill and over build for my purposes. However, to date, I have spent $41 dollars and am quite enjoying the project.

Share this:

  • Click to share on X (Opens in new window) X
  • Click to share on Facebook (Opens in new window) Facebook
  • Click to share on LinkedIn (Opens in new window) LinkedIn
  • Click to share on Pinterest (Opens in new window) Pinterest

Like this:

Like Loading...

Recent Posts

  • Setting up a dot local domain
  • Updating my Wireless Access Point
  • Update the HomeLab Server
  • KVM Switch Upgrade in the Homelab
  • Homelab New Years Resolutions

Tags

24-Pounder Allen Astrophotography Barton Borthwick Civil War Computers Debian destination4x4 DNS Duffy Engle Ensley Genealogy German Equatorial Mount HAProxy Headstock Spider Homelab Home Shop immigrant IOT Ireland Keepalived Lathe Lewis Horizontal Mill Lewis Mill Linux Model Naval Gun Network NZXT Phelan Photography Rathbone Rathbun Reilly Revolutionary War Server South Bend Technology Telescope Tooling Veteran vintage machinery Wight

Blogroll

  • Destination 4×4

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
©2025 James Rathbun | WordPress Theme by Superbthemes.com
%d